06 — Completion

Connecting the reservoir to the well.

Completion engineering transforms a drilled and evaluated well into a controlled production or injection system, connecting selected reservoir intervals to the wellbore while maintaining integrity and operational control.

Well completion

The drilled well becomes a functioning production system.

Drilling creates access to the subsurface. Completion engineering determines how that access is converted into a controlled connection between the reservoir and the surface production or injection system.

The completion must reflect the reservoir characteristics, expected production behaviour, well integrity requirements and the operating strategy established during field development.

Completion workflow

From formation evaluation to start-up readiness.

Completion decisions integrate formation evaluation, reservoir behaviour, well integrity and production objectives before the well is handed over for testing and production.

01

Completion Design Basis

Translate the reservoir, well and production objectives into a completion architecture suited to the expected downhole conditions.

Key activities

  • Completion objectives
  • Reservoir and fluid characteristics
  • Production and injection requirements
  • Pressure and temperature conditions
  • Wellbore and integrity constraints
02

Formation & Well Evaluation

Confirm the productive intervals and evaluate the formation and well conditions before installing the completion.

Key activities

  • Open-hole and cased-hole logs
  • Formation evaluation
  • Production-zone identification
  • Cement and casing evaluation
  • Formation pressure and fluid information
03

Completion Architecture

Select the equipment and configuration required to establish a reliable connection between the reservoir and the production system.

Key activities

  • Completion string design
  • Tubing and packer selection
  • Downhole safety equipment
  • Perforation strategy
  • Sand-control requirements
04

Well Intervention & Stimulation

Where required, prepare the reservoir and wellbore to establish or improve productive communication with the target interval.

Key activities

  • Perforation
  • Acid stimulation
  • Hydraulic fracturing
  • Sand-control treatments
  • Well clean-up and displacement
05

Installation & Well Integrity

Install and verify the completion while maintaining the required well barriers and integrity throughout the operation.

Key activities

  • Completion installation
  • Pressure testing
  • Barrier verification
  • Well control
  • Mechanical and operational verification
06

Well Start-up Readiness

Prepare the completed well for testing and production by confirming the well, completion and surface interfaces are ready.

Key activities

  • Completion acceptance
  • Well clean-up
  • Initial flow preparation
  • Production system readiness
  • Handover to well testing and production

Integrated disciplines

Completion sits at the interface between reservoir and production.

Completion decisions must account for both the behaviour of the formation and the requirements of the well and production system.

Completion Engineering
Production Engineering
Reservoir Engineering
Petrophysics
Formation Evaluation
Well Integrity
Drilling Engineering
Well Intervention
Stimulation Engineering
Production Operations

Completion decision

The completion must serve the reservoir and the well's life.

01

Which reservoir intervals should be completed?

02

What completion architecture best matches the reservoir and production objective?

03

Is stimulation or sand control required?

04

How will the completion maintain well integrity throughout the well's life?

05

How will production or injection be controlled and monitored?

06

What evidence is required before the well moves into testing and production?

Engineering chain

Formation EvaluationCompletion DesignInstallation & IntegrityWell Start-upWell Testing

Next stage

07 — Well Testing

With the well completed, testing establishes how the reservoir and well actually behave under flow and pressure conditions.

Continue to Well Testing →