05 — Well Planning & Drilling

Designing and constructing the well that reaches the reservoir.

Well planning and drilling translate the development strategy into a safely constructed well, integrating subsurface objectives, well architecture, pressure behaviour, drilling engineering and real-time operational decisions.

Well construction

The reservoir objective becomes a physical well.

A drilling programme must connect the subsurface target with a practical well design. Geological prognosis, pressure prediction, trajectory, casing, drilling fluids and well barriers must work together.

Drilling is also an information-generating process. Measurements acquired while drilling can confirm or challenge the original geological and reservoir assumptions and influence decisions before the well reaches its final depth.

Well delivery workflow

From objectives to a completed well.

The well moves through progressively more detailed engineering decisions, with continuous integration between subsurface information and drilling operations.

01

Well Objectives & Design Basis

Translate the field development requirements into clear objectives for each well and establish the technical basis for design.

Key activities

  • Well objectives and success criteria
  • Target formation and reservoir prognosis
  • Well type and trajectory selection
  • Offset-well review
  • Subsurface and operational constraints
02

Well Planning

Develop the well architecture, trajectory and drilling programme required to reach the target safely and efficiently.

Key activities

  • Well trajectory and directional planning
  • Casing and hole-section design
  • Mud programme
  • Cementing basis
  • BHA and drilling parameter planning
03

Geohazards & Well Integrity

Identify subsurface and operational hazards and establish the barriers and controls required for safe well construction.

Key activities

  • Pore-pressure and fracture-gradient prognosis
  • Wellbore stability assessment
  • Lost-circulation risk
  • Shallow hazards and abnormal pressure
  • Well-control and barrier considerations
04

Drilling Execution

Construct the well according to the approved programme while continuously responding to actual subsurface and drilling conditions.

Key activities

  • Rig and drilling operations
  • Real-time drilling surveillance
  • Mud logging and formation monitoring
  • Directional drilling
  • Operational decision-making and reporting
05

Formation Evaluation While Drilling

Use drilling and formation data to continuously improve understanding of the formations encountered and the well's position within the reservoir.

Key activities

  • Mud logging
  • Gas and hydrocarbon shows
  • LWD and MWD measurements
  • Formation tops and correlation
  • Real-time formation evaluation
06

Well Delivery

Bring the drilled well to the required technical standard and prepare it for formation evaluation, completion and subsequent operations.

Key activities

  • Well construction verification
  • Casing and cement evaluation
  • Final well records
  • Formation evaluation handover
  • Completion readiness

Integrated disciplines

A well is an integrated engineering system.

Successful well construction requires coordinated decisions between subsurface teams, drilling specialists and well integrity disciplines.

Drilling Engineering
Directional Drilling
Geology & Geophysics
Petroleum Engineering
Petrophysics
Well Logging
Well Control
Cementing
Drilling Fluids
Well Integrity

Well planning decisions

Every design decision must connect back to the well objective.

01

What is the primary objective of the well?

02

Where exactly should the well enter and penetrate the target reservoir?

03

What pressure, stability and geohazard conditions are expected?

04

What casing, mud and cement design provides the required well barriers?

05

How should the trajectory and drilling parameters respond to the subsurface?

06

What evidence confirms that the well is ready for completion?

Engineering chain

Reservoir TargetWell DesignPressure & Well ControlDrilling & EvaluationCompletion Ready

Next stage

06 — Completion

Once the well has been drilled and evaluated, completion engineering determines how the reservoir will be connected to the wellbore and brought into productive operation.

Continue to Completion →